Great progress at the 2 storey extension in Milland

The extension in Milland is really coming together now.

The 2nd storey roof is complete including the installation of two velux windows. The windows and patio doors flood the master bedroom with natural light. The vaulted ceiling also adds to the sense of space in the room.

Glazing and doors are in the process of being fitted on the first floor. Inside, first fix plumbing and electrical work has been completed along with the installation of plasterboard throughout. Next step – plastering.